Seeing who is free for part of the shift

You've got a ten-day shift to crew and a list of people who could do it. Nobody is free for all ten days. One person is available for the first six, another can't start until day six, and a third is free for the whole stretch except a weekend in the middle. None of them is a clean yes, and none of them is a no.

Most rosters only answer yes or no

A spreadsheet or a basic availability filter tends to treat a worker as free or not for the shift as a whole. Anyone who isn't free for every day drops off the list, so the rosterer sees nobody and starts ringing around. The people who could cover most of the shift are invisible, and the answer sitting in the data never gets looked at.

The opposite failure is worse. Someone gets booked for all ten days because they were free for most of it, and the gap turns up later. They mention on day three that they've got a wedding that weekend, or the office finds out when the worker rings to say they can't make the back half. Now the shift gets split anyway, only nobody planned it, and the replacement is found in a hurry.

What the crew panel shows

In Mustr the shift editor has a crew panel showing each person's role, their verified competencies and the exact dates they're free, including partial fits. Anyone locked into another site that week is greyed out with the clashing site and dates, so you can see why they aren't an option. People who applied for an open shift are listed on the shift as well, one tap to assign.

My rosterCards, not a timeline squeezedonto a handset.Current shift pinned on topCountdown, site, day or nightLength and confirmed statusFlights and accommodationAdd to my calendar, one tapOn site nowNorth Site · DayIn 3 daysWest Site · NightIn 11 daysNorth Site · DayIn 24 daysWest Site · Day
The crew's roster on a phone: the current shift on top, the rest as cards.

That turns the ten-day problem into something you can actually look at. One person covers the first six days, another covers the last five, and they overlap on day six. Whether that's a good answer is still your call, but you're making it with the dates in front of you rather than a phone list. The greyed-out side of the panel is covered in seeing the clash before you book it.

The panel is only as good as the availability behind it. Workers drag out their availability in the worker portal on their phone, and admins set how often they're reminded to keep it filled in. If your crew don't keep theirs current, partial fits will look like full ones. The check at booking blocks days a worker has marked unavailable, but it can't block days they never told you about.

Splitting a shift on purpose

A deliberate split is a decision about the work, not just the calendar. Before making it, ask whether the job suits two people.

Some work hands over easily. General labour on a stable scope, or a role where the site's routine does most of the explaining, can change hands without much fuss. Other work doesn't. A supervisor role, a task halfway through something complex, or a client who has told you continuity matters on their site can all cost more in handover than you save by not finding one person for the whole stretch. In those cases it may be better to shorten the shift and talk to the client about the remaining days.

If the job does suit a split, choose the handover day rather than letting it fall wherever the dates happen to meet. On remote work an overlap day, with both people on site together, is often worth paying for. The incoming worker gets a proper walk-through instead of a note in the crib room. Where there's no overlap, ring the outgoing worker before they leave and get the handover in their own words.

Check the travel as well. Two people on one shift can mean two sets of flights and two rooms. Mustr tracks flights and accommodation on the shift, visible to the office and the client, so it's clear who flies in on which day.

Tell everyone the plan

A split the client didn't know about looks like a mistake, even when it was planned. Tell them before the first person arrives. Mustr tells clients when their request is crewed, with names, and when a shift changes, with the previous details next to the new. Crew are told when their shift's dates change or when they come off a shift, and the "let the people affected know" tick on the shift form is on by default.

Automatic notices cover the facts. Ring the client anyway if the split changes who their supervisor will be dealing with halfway through, and make sure both workers have each other's name and number before the handover day, so the second person isn't meeting the job cold.

The rostering page covers the rest of the shift editor, or you can try it with sample data and look at partial fits on a shift of your own.